Pollard Wood Amersham

Fitting out of the new Chief Executives suite over two floors and in two phases. https://worthcompare.com/5qpxz2zm The areas were stripped out of their existing partitions and general finishes, areas of ceilings removed, sections of Chilled beams removed with new and modified areas installed. Areas of raised access floor lifted to enable new and revised power and data cabling installation. New partitions, floor finishes, and decorations through out.

https://tankinz.com/ctwoyq6rq5 The centrepiece of the project being an elliptical shaped boardroom constructed at ground floor level, in full height glazed partitioning, with electrically operated blinds. Boardroom table manufactured to suite the shape of the room.

https://www.jamesramsden.com/2024/03/07/eelcs9s4

https://www.jamesramsden.com/2024/03/07/9nl0pzvj Contract Value: £1.0 Million