Fitting out of the new Chief Executives suite over two floors and in two phases. The areas were stripped out of their existing partitions and general finishes, areas of ceilings removed, sections of Chilled beams removed with new and modified areas installed.
Areas of raised access floor lifted to enable new and revised power and data cabling installation. New partitions, floor finishes, and decorations through out.